 Latest Project
"Emissions are only 3.3% of the allowable. Thank you. An excellent job in the design and execution. Please send thanks to the entire Lipten team for a job well done."

—Corporate Utilities Engineer at an Asphalt Company

 
Latest Videos

Latest Project
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Process Dryer
Industry: Industrial
Client: Navarre, OH
Scope: Lipten completed the design, fabrication, installation and commissioning of a unique low-cost dryer concept for the Cultured Stone division of Owens Corning. Lipten combined modified insulated shipping containers with commercial HVAC furnaces and the versatile Lipten CombustionPacâ„¢ control system to create a simple yet effective drying system. The overall system allowed for forklift loading of product and tight curing temperature control.  The system was automated to ensure specific moisture content and alert when product cycle was complete.