  RETROFIT

Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Heat Recover Steam Boiler & Turbines
Client: Natural Gas Processing Facility
Scope: Lipten was contracted to provide engineering, project management, equipment, installation, start-up and training services for a new heat recovery steam boiler and turbine system. The equipment included two heat recovery steam generators, two economizers, two deaerators, two 2,000 hp steam turbines and associated stacks and ducting.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: GM - SPO- Feedwater Pumps
Client: General Motors
Scope: Project called for the replacement of three pumps with vertical multi-stage centrifugal pumps underneath the DA tank. In addition, Lipten installed three HBE Arc valves.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Industrial Waste Heat Generator
Client: Private
Scope: Lipten provided complete EPC services for an industrial retrofit project that included a Thermal Oxidizer, Waste Heat Boiler, a steam condenser, DA tank, all the controls plus an electrical equipment line up.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: GM Service Parts Operations - Swartz Creek
Client: General Motors Corp. - Pontiac, MI
Scope: Converted three 45,000-pph field erected coal fired boilers to front wall fired low NOx natural gas fired burners, FD fans, VFD and control on ID fans, fuel trains, extensive tube repairs and modifications, spray-tray deaerator system with feedwater pumps, duplex softener system, chemical feed system, blowdown heat recovery system, three burner management and combustion control systems, boiler plant master control system, PC-based plant monitoring system.