"The project was handled in a manner that always made you aware of your value as the customer. Jim (Lipten project manager) responded to all inquiries in a prompt and extremely professional manner. You could always sense that he was concerned about doing everything within his power to keep the project moving and the customer happy. John (Lipten site supervisor) did an outstanding job of coordinating the work in the field. He made the necessary contacts to get clarification for any questions that arose in a timely manner and was always in contact with the key players needed to keep the project moving. I’m pleased to be closing out my career with the State of Pennsylvania having had the opportunity to see a project of this magnitude completed without the ever familiar delays that typically occur within the layers of the State Government decision making process."

—Michael McGrath, Allentown State Hospital

  RENEWABLES

Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Renewable Energy Facility – Cleveland, Ohio
Client: Northeast Ohio Regional Sewer District (NEORSD)
Scope: Lipten is providing engineering, procurement and startup services for an Energy Recovery System (ERS) for the Northeast Ohio Regional Sewer District. This project involves creating steam using waste heat from sludge incinerators to drive a 3MW turbine. Lipten’s equipment scope of supply includes: 3MW turbine, condensers, water softeners, reverse osmosis system, deaerator, blowdown systems, chemical feed systems, condensate receiver, desuperheaters, miscellaneous tanks and transfer pumps as well as local equipment controls and ERS supervisory controls. Lipten’s engineering scope includes: confirm equipment design and functionality is in compliance with drawings and specifications, equipment fabrication expediting, drawing redlines based on updated engineered design and finalized equipment, confirmation of controls hardware and software architecture, confirm pipe sizing and material of construction, and additional oversight of the ERS design and installation. Startup is scheduled for Summer 2013. Lipten services and equipment are critical to the success of this over $100 Million project.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: 24 MW Woody Biomass
Client: Private
Scope: This 24MW Co-Generation plant will use wood waste as the primary feed-stock for a 325,000 lb.per hour Field Erect solid fuel stoker type boiler operating at 850psig from Lipten. Complete EPC services will be provided by Lipten. Other equipment will include CombustionPac controls by Lipten for all the burner management controls, combustion controls and balance of plant controls, economizer, DA tank, fuel handling system, water treatment system, co-generating equipment, cooling tower and air emmissions equipment.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: GM Assembly
Client: General Motors
Scope: 300,000 lbs/hr CFB at 1460 psig and 955 degrees F.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: 36MW Woody Biomass
Client: City of Grayling
Scope: 36MW Woody Biomass Co-Generation station. 330,000 lbs/hr stoker fired boiler at 1250 psi and 950 degrees. Plant came online in 1992